CAVA AND PRESIDENT BEACHES


Development of the Valamar Dubrovnik President beach and Kava beach.


Investor:
Valamar Riviera d.d., Poreč


Project characteristics:
Carried out works on the seabed, RC pylons as bearers of the breakwaters, carried out RC breakwaters and rock barriers to reduce sea action against the foreshore. Approx. 11,000 m3 of rock material with a greater granulation installed. A total of 6 RC pylons constructed – totalling 156 m3 of concrete and 26 T of rebars.


Facts:
"Undertaking of works on the seabed – AB pylons as load bearers for the breakwater, construction of RC breakwater and rock wall in order to reduce the action of the sea on the foreshore. Underwater works carried out with buoyancy equipment. The construction deadline was 5 months. "


Year of completion:
2015


Financial value:
7.844.337,32 kn