ŽELJEZNIČKI PODVOŽNJAK, POTHODNIK I CRPNA STANICA U SLAVONSKOM BRODU


Construction of the railway underpass, 2 traffic lanes, 2 carriageways with footpaths, underpass, passes under the 3 railway tracks and pumping station in Slavonski Brod.


Investor:
HRVATSKE CESTE d.o.o., Zagreb


Project characteristics:
"The length of the project overall: underpass – length 55m, 2 traffic lanes, passes under 3 railway tracks and 2 carriageways with footpaths; corridor pass – developed length 40 m, passes under the 3 railway tracks; pumping station with dimensions 4 x 5 m including 3 underground levels to a depth of 13m. "


Facts:
The facility is building is built using a top-down construction technology including the protection of the facility pit using RC diaphragms. The intersection angle of the underpass and railway tracks is a demanding 47°. For the first time in the Republic of Croatia, structures were built in a railway line belt using this technology.


Year of completion:
2016


Financial value:
13.500.000,00 kn